Maintenance Requests Street Maintenance Park Maintenance Maps 2025 Q1 & Q2 - Maintenance By The Numbers Tree Trimming 600,000 lbs. of tree limbs and debris removed from public right of ways, adding up to 1000 yards of chipped material. Street Lights 106 Light Poles Replaced Street Sweeping 292 Lane Miles Swept Over 540,000 lbs. of material collected from roadways. 2024 Maintenance by the Numbers Sidewalk Panels Replaced 213 Panels Street Signs Replaced 87 Signs Garbage from City Receptacles ~99,000 lbs. / year Road Sealant 42,240 linear feet Street Sweeping 450 miles Stormwater Basins 32 catch basins cleared