The Binding Site Plan application proposes the construction of an approximate 90,400 square foot, three-story self-storage facility with associated parking areas, utility infrastructure, landscaping, stormwater facilities, and frontage improvements on the 3.60 acre parcel. The eastern portion of the site is currently occupied by a plant nursery while the balance of the site to the west includes a Category II wetland, buildings in disrepair, and vegetation comprised of native and invasive plant species. A wetland buffer restoration and enhancement plan will be implemented as part of the project. A Reasonable Use Exception is required to accommodate the project as submitted. While encroachment into the buffer is anticipated, the project will result in a significant increase in wetland and buffer functions and values given the existing disturbed condition.
Project Status
The city received and approved a Minor Modification to the Cube Binding Site Plan, PL2018-0013, with a name change from Cubes to Mill Creek Self Storage. The proposed modification to the approved Binding Site Plan PL2018-0013 includes the following:
- The building footprint from 34,225 SF to 22,648 SF
- Total Building Area from 90,425 SF to 90,590 SF
- Emergency vehicle access
- Number of Storage Units not to exceed 600 units.
The proposed modification includes adding daylight at the lower level of the building and eliminating the drive-under building (see attached approved plan PL2018-0013). Revision to site circulation includes driving around the building with parking redistributed based on the revised building footprint.
Design Review Board (DRB) Staff Report
Hearing Examiner Staff Report - Exhibit 1
Site Plan - Revised 8/20/18 - Exhibit 1b
Land Use Application - Exhibit 2
Owner's Letter of Authorization - Exhibit 3
Project Narrative - Revised 8/15/18 - Exhibit 4
Title Report - Exhibit 5
Tree Survey - Exhibit 6
Preliminary Landscape Plan- Revised 8/15/18 - Exhibit 7
Geotechnical Report- Revised 8/15/18 - Exhibit 8
Traffic Study - Revised 8/20/18 - Exhibit 9
Waster and Sewer Availability - Exhibit 10
Preliminary Drainage Report - Revised 8/20/18 - Exhibit 11
Critical Area Report - Revised 8/28/18 - Exhibit 12
Preliminary Clearing and Grading - Revised 8/20/18 - Exhibit 13
Notice of Development Application - Exhibit 14
Completeness Letter - Exhibit 15
Technical Review Comments - Exhibit 16
City's Wetland Review - Exhibit 17
MDNS - Issued 8/29/18 - Exhibit 18
Environmental Checklist - Revised 8/20/18 - Exhibit 18
Public Hearing Notice - Exhibit 19
City's Engineering Review - Exhibit 20